Current Projects: Overview
  • Group I Project
  • Vallejo Center
  • Vacaville Center
  • Bldg 400 - Student Services Center


  • Group III Project
  • Bldg 300 - Science
  • Bldg 400 - Student Services
  • Bldg 500 - Business
  • Bldg 700 - Humanities
  • Bldg 800 - Health Occupations / Public Services
  • Bldg 900 - Faculty Office Building
  • Bldg 1400 - Bookstore / Cafeteria / Student Union
  • Bldg 1500 - Math/Engineering
  • Bldg 1700 - Physical Education
  • Bldg 1800A - Career Technical Education
  • Bldg 1800B - Swing Space
  • Bldg 2600 - Restroom Building
  • Hydronics Project
  • Nut Tree Hanger


  • Bond Scheduled Maintenace Projects
































    SOLANO COMMUNITY COLLEGE DISTRICT
    2004-10 SUMMARY

    PROJECTS

    2004-05 $
    1.  Replace Motor Control Center, Fine Arts 32,000
    2.  Replace SID Pump Station 77,860
    3.  Replace Irrigation Systems, Phase II 225,950
    4.  Replace Irrigation Systems, Phase III 274,226
    5.  Major Repairs, Two Service Road Bridges (baseball field and back undeveloped area) 22,160
    6.  Scheduled Replacement of Toilet Partitions 14,000
    7.  Scheduled Repairs Athletic Facilities 15,000
    8.  Scheduled Replacement of Window Shades, Blinds & Chalkboards 7,500
    9.  Scheduled Paint Program 15,000
    10.  Misc. Sidewalk Repairs 15,000
    11.  Retrofit Lights in Cosmetology section of Bld 1600 14,500
    12.  Replace Pool Complex Lighting 42,850
    2004-05 TOTAL    $756,046



    2005-06 $
    1.  Replace Valves, Hot Water Distribution System, Campus Wide 47,250
    2.  Re-roof Business Bld 500 92,252
    3.  Replace HVAC Systems, Business Bld 500 211,752
    4.  Replace HVAC Ducts, Business Bld 500 35,100
    5.  Replace Floor Tile, Business Bld 500 36,060
    6.  Re-roof Math/Engineering Bld 1500 92,159
    7.  Replace HVAC Systems, Math/Engineering Bld 1500 211,484
    8.  Replace HVAC Ducts, Math/Engineering Bld 1500 22,500
    9.  Replace Floor Tile, Math/Engineering Bld 1500 35,500
    10.  Replace Fixed Seating Various Rooms Bld 300 51,500
    11.  Replace Floor Tile, Science Bld 300 75,140
    12.  Replace Hot Water Distribution System, Phase I 550,000
    13.  Replace Hot Water Distribution System, Phase II 550,000
    14.  Replace Chilled Water Distribution System, Phase I 550,000
    15.  Replace Chilled Water Distribution System, Phase II 550,000
    16.  Replace Underground Domestic Water Building Isolations Values 255,000
    17.  Replace/Upgrade Fire & Intrusion Alarms 518,120
    18.  Replace Emergency Lighting Systems, Campus Wide 397,500
    19.  Replace Master Clock System, Campus Wide 213,700
    20.  Replace Food Service Walk-in Boxes Bld 1400 40,450
    21.  Replace Tennis Court Lighting 43,444
    22.  Scheduled Replacement of Toilet Partitions 14,000
    23.  Scheduled Repairs Athletic Facilities 15,000
    24.  Scheduled Replacement of Window Shades, Blinds & Chalkboards 7,500
    25.  Scheduled Paint Program 15,000
    26.  Misc. Sidewalk Repairs 15,000
    2005-06 TOTAL    $4,645,411



    2006-07 $
    1.  Repair & Resurface Parking Lots B, E & F 68,475
    2.  Repair & Resurface Inner Campus Roadway 105,691
    3.  Improve Parking Lot and Inter Campus Lighting 529,355
    4.  Replace/Upgrade Exit Lighting Systems, Campus Wide 547,445
    5.  Re-roof Social Science Bld 700 138,357
    6.  Replace HVAC Systems, Social Science Bld 700 331,895
    7.  Replace HVAC Ducts, Language Arts Bld 700 32,750
    8.  Replace Floor Tile, Social Science Bld 700 52,300
    9.  Replace HVAC Ducts, Multidiscipline Bld 800 39,200
    10.  Re-carpet Multidiscipline Office Bld 800 18,860
    11.  Replace Floor Tile, Hallway, Multidiscipline Bld 800 8,650
    12.  Replace Three Central Plant Boilers 412,500
    13.  Replace Five Electrical Substations 740,650
    14.  Scheduled Replacement of Window Shades, Blinds & Chalkboards 7,500
    15.  Scheduled Replacement of Toilet Partitions 15,000
    16.  Scheduled Paint Program 15,000
    17.  Misc. Sidewalk Repairs 15,000
    18.  Scheduled Repairs Athletic Facilities 44,500
    2006-07 TOTAL    $3,123,128



    2007-08 $
    1.  Replace Roof Bld 1600 126,693
    2.  Replace HVAC Roof Top System, Bldg 1600 302,735
    3.  Re-roof Gym Bld 1700 385,038
    4.  Replace HVAC System, Gym 1700 991,770
    5.  Replace Pool Misc Equipment & Controls 71,045
    6.  Replace Pool Deck 340,995
    7.  Re-roof Voc Tech Bld 1800A 77,207
    8.  Replace HVAC System, Voc Tech Bld 1800A 175,545
    9.  Replace Floor Tile, Voc Tech Complex Bld 1800 48,300
    10.  Scheduled Replacement of Window Shades, Blinds & Chalkboards 7,500
    12.  Scheduled Paint Program 15,000
    13.  Misc. Sidewalk Repairs 15,000
    2007-08 TOTAL    $2,556,828



    2008-09 $
    1.  Re-roof Theatre Bld 1200 178,714
    2.  Replace HVAC Systems, Theatre Bld 1200 512,685
    3.  Replace Dimmers & Lighting System, Theatre 1200 274,000
    4.  Repair & Recover Theatre Seating, Theatre Bld 1200 33,550
    5.  Re-roof Fine Arts Bld 1300 104,452
    6.  Replace HVAC Systems, Fine Arts Bld 1300 240,133
    7.  Re-carpet Fine Arts Office Bld 1300 77,860
    8.  Scheduled Replacement of Window Shades, Blinds & Chalkboards 7,500
    9.  Scheduled Paint Program 15,000
    10.  Scheduled Repairs Athletic Facilities 15,000
    11.  Landscape Undeveloped Intercampus Areas 361,000
    12.  Misc. Sidewalk Repairs 15,000
    2008-09 TOTAL    $1,834,894



    2009-10 $
    1.  Re-roof Voc Tech Bld 1800B 199,471
    2.  Replace HVAC Systems, Voc Tech Bld 1800B 245,840
    3.  Modify Three Voc Tech Locker Rooms, Bld 1800B, Code Compliance 270,750
    4.  Replace Fountain Sinks, Voc Tec Shops 1800B 9,100
    5.  Replace Roll-up Door Hardware, Voc Tech Shops Bldg 1800B 49,500
    6.  Re-roof Administration Bld 600 110,314
    7.  Replace HVAC Systems, Administration Bld 600 254,783
    8.  Replace HVAC Ducts, Administration Bld 600 27,500
    9.  Replace Floor Tile, Administration Bld 600 39,500
    10.  Re-roof Child Care Bld 400 7,446
    11.  Replace HVAC Systems, Child Care Bld 400 7,260
    12.  Re-roof Warehouse Bld 1900 37,555
    13.  Replace HVAC Systems, Warehouse Bld 1900 43,750
    14.  Repair & Tile Shower Areas, Stadium Locker Rooms 270,000
    15.  Replace Sewage Pumps, Stadium 27,450
    2009-10 TOTAL    $1,600,219



    SUMMARY

    2004-05
    2005-06
    2006-07
    2007-08
    2008-09
    2009-10

    TOTAL:
    $756,046
    $4,645,411
    $3,123,128
    $2,556,828
    $1,834,894
    $1,600,219

    $14,516,526

    Revised 7/1/05





    Home Page |  Program Description & Timeline |  Project Information |  Communications
    Glossary of Terms |  Press Release |  Contact Information |  Site Map




    Questions or comments on this site? E-mail: Web Administrator