Current Projects: Overview
Group I Project
Vallejo Center
Vacaville Center
Bldg 400 - Student Services Center
Group III Project
Bldg 300 - Science
Bldg 400 - Student Services
Bldg 500 - Business
Bldg 700 - Humanities
Bldg 800 - Health Occupations / Public Services
Bldg 900 - Faculty Office Building
Bldg 1400 - Bookstore / Cafeteria / Student Union
Bldg 1500 - Math/Engineering
Bldg 1700 - Physical Education
Bldg 1800A - Career Technical Education
Bldg 1800B - Swing Space
Bldg 2600 - Restroom Building
Hydronics Project
Nut Tree Hanger
Bond Scheduled Maintenace Projects
|
|
SOLANO COMMUNITY COLLEGE DISTRICT
2004-10 SUMMARY
PROJECTS
2004-05 |
|
$ |
1. |
Replace Motor Control Center, Fine Arts
|
32,000 |
2. |
Replace SID Pump Station
|
77,860 |
3. |
Replace Irrigation Systems, Phase II
|
225,950 |
4. |
Replace Irrigation Systems, Phase III
|
274,226 |
5. |
Major Repairs, Two Service Road Bridges (baseball field and back undeveloped area)
|
22,160 |
6. |
Scheduled Replacement of Toilet Partitions
|
14,000 |
7. |
Scheduled Repairs Athletic Facilities
|
15,000 |
8. |
Scheduled Replacement of Window Shades, Blinds & Chalkboards
|
7,500 |
9. |
Scheduled Paint Program
|
15,000 |
10. |
Misc. Sidewalk Repairs
|
15,000 |
11. |
Retrofit Lights in Cosmetology section of Bld 1600
|
14,500 |
12. |
Replace Pool Complex Lighting
|
42,850 |
|
2004-05 TOTAL |
$756,046 |
2005-06 |
|
$ |
1. |
Replace Valves, Hot Water Distribution System, Campus Wide
|
47,250 |
2. |
Re-roof Business Bld 500
|
92,252 |
3. |
Replace HVAC Systems, Business Bld 500
|
211,752 |
4. |
Replace HVAC Ducts, Business Bld 500
|
35,100 |
5. |
Replace Floor Tile, Business Bld 500
|
36,060 |
6. |
Re-roof Math/Engineering Bld 1500
|
92,159 |
7. |
Replace HVAC Systems, Math/Engineering Bld 1500
|
211,484 |
8. |
Replace HVAC Ducts, Math/Engineering Bld 1500
|
22,500 |
9. |
Replace Floor Tile, Math/Engineering Bld 1500
|
35,500 |
10. |
Replace Fixed Seating Various Rooms Bld 300
|
51,500 |
11. |
Replace Floor Tile, Science Bld 300
|
75,140 |
12. |
Replace Hot Water Distribution System, Phase I
|
550,000 |
13. |
Replace Hot Water Distribution System, Phase II
|
550,000 |
14. |
Replace Chilled Water Distribution System, Phase I
|
550,000 |
15. |
Replace Chilled Water Distribution System, Phase II
|
550,000 |
16. |
Replace Underground Domestic Water Building Isolations Values
|
255,000 |
17. |
Replace/Upgrade Fire & Intrusion Alarms
|
518,120 |
18. |
Replace Emergency Lighting Systems, Campus Wide
|
397,500 |
19. |
Replace Master Clock System, Campus Wide
|
213,700 |
20. |
Replace Food Service Walk-in Boxes Bld 1400
|
40,450 |
21. |
Replace Tennis Court Lighting
|
43,444 |
22. |
Scheduled Replacement of Toilet Partitions
|
14,000 |
23. |
Scheduled Repairs Athletic Facilities
|
15,000 |
24. |
Scheduled Replacement of Window Shades, Blinds & Chalkboards
|
7,500 |
25. |
Scheduled Paint Program
|
15,000 |
26. |
Misc. Sidewalk Repairs
|
15,000 |
|
2005-06 TOTAL |
$4,645,411 |
2006-07 |
|
$ |
1. |
Repair & Resurface Parking Lots B, E & F
|
68,475 |
2. |
Repair & Resurface Inner Campus Roadway
|
105,691 |
3. |
Improve Parking Lot and Inter Campus Lighting
|
529,355 |
4. |
Replace/Upgrade Exit Lighting Systems, Campus Wide
|
547,445 |
5. |
Re-roof Social Science Bld 700
|
138,357 |
6. |
Replace HVAC Systems, Social Science Bld 700
|
331,895 |
7. |
Replace HVAC Ducts, Language Arts Bld 700
|
32,750 |
8. |
Replace Floor Tile, Social Science Bld 700
|
52,300 |
9. |
Replace HVAC Ducts, Multidiscipline Bld 800
|
39,200 |
10. |
Re-carpet Multidiscipline Office Bld 800
|
18,860 |
11. |
Replace Floor Tile, Hallway, Multidiscipline Bld 800
|
8,650 |
12. |
Replace Three Central Plant Boilers
|
412,500 |
13. |
Replace Five Electrical Substations
|
740,650 |
14. |
Scheduled Replacement of Window Shades, Blinds & Chalkboards
|
7,500 |
15. |
Scheduled Replacement of Toilet Partitions
|
15,000 |
16. |
Scheduled Paint Program
|
15,000 |
17. |
Misc. Sidewalk Repairs
|
15,000 |
18. |
Scheduled Repairs Athletic Facilities
|
44,500 |
|
2006-07 TOTAL |
$3,123,128 |
2007-08 |
|
$ |
1. |
Replace Roof Bld 1600
|
126,693
|
2. |
Replace HVAC Roof Top System, Bldg 1600
|
302,735 |
3. |
Re-roof Gym Bld 1700
|
385,038 |
4. |
Replace HVAC System, Gym 1700
|
991,770 |
5. |
Replace Pool Misc Equipment & Controls
|
71,045 |
6. |
Replace Pool Deck
|
340,995 |
7. |
Re-roof Voc Tech Bld 1800A
|
77,207 |
8. |
Replace HVAC System, Voc Tech Bld 1800A
|
175,545 |
9. |
Replace Floor Tile, Voc Tech Complex Bld 1800
|
48,300 |
10. |
Scheduled Replacement of Window Shades, Blinds & Chalkboards
|
7,500 |
12. |
Scheduled Paint Program
|
15,000 |
13. |
Misc. Sidewalk Repairs
|
15,000 |
|
2007-08 TOTAL |
$2,556,828 |
2008-09 |
|
$ |
1. |
Re-roof Theatre Bld 1200
|
178,714 |
2. |
Replace HVAC Systems, Theatre Bld 1200
|
512,685 |
3. |
Replace Dimmers & Lighting System, Theatre 1200
|
274,000 |
4. |
Repair & Recover Theatre Seating, Theatre Bld 1200
|
33,550 |
5. |
Re-roof Fine Arts Bld 1300
|
104,452 |
6. |
Replace HVAC Systems, Fine Arts Bld 1300
|
240,133 |
7. |
Re-carpet Fine Arts Office Bld 1300
|
77,860 |
8. |
Scheduled Replacement of Window Shades, Blinds & Chalkboards
|
7,500 |
9. |
Scheduled Paint Program
|
15,000 |
10. |
Scheduled Repairs Athletic Facilities
|
15,000 |
11. |
Landscape Undeveloped Intercampus Areas
|
361,000 |
12. |
Misc. Sidewalk Repairs
|
15,000 |
|
2008-09 TOTAL |
$1,834,894 |
2009-10 |
|
$ |
1. |
Re-roof Voc Tech Bld 1800B
|
199,471 |
2. |
Replace HVAC Systems, Voc Tech Bld 1800B
|
245,840 |
3. |
Modify Three Voc Tech Locker Rooms, Bld 1800B, Code Compliance
|
270,750 |
4. |
Replace Fountain Sinks, Voc Tec Shops 1800B
|
9,100 |
5. |
Replace Roll-up Door Hardware, Voc Tech Shops Bldg 1800B
|
49,500 |
6. |
Re-roof Administration Bld 600
|
110,314 |
7. |
Replace HVAC Systems, Administration Bld 600
|
254,783 |
8. |
Replace HVAC Ducts, Administration Bld 600
|
27,500 |
9. |
Replace Floor Tile, Administration Bld 600
|
39,500 |
10. |
Re-roof Child Care Bld 400
|
7,446 |
11. |
Replace HVAC Systems, Child Care Bld 400
|
7,260 |
12. |
Re-roof Warehouse Bld 1900
|
37,555 |
13. |
Replace HVAC Systems, Warehouse Bld 1900
|
43,750 |
14. |
Repair & Tile Shower Areas, Stadium Locker Rooms
|
270,000 |
15. |
Replace Sewage Pumps, Stadium
|
27,450 |
|
2009-10 TOTAL |
$1,600,219 |
SUMMARY
2004-05
2005-06
2006-07
2007-08
2008-09
2009-10
TOTAL:
|
$756,046
$4,645,411
$3,123,128
$2,556,828
$1,834,894
$1,600,219
$14,516,526
|
Revised 7/1/05
|
|